MISSION GATEWAY, a mixed-use complex that was supposed to have replaced MISSION CENTER MALL. Announced back in 2006, it would have been completed by 2009, had Wall Street's shenanigans not tanked the global economy. Delayed several times over the years, construction is plotted to begin in March 2017. The WalMart depicted here has been dropped from a revised plan.
Graphic from http://www.mission-ks.org/index.aspx?NID=136